The Zubair Oil Field Development Project is one of the key oil production infrastructure projects in Iraq, led by Eni. The project involved the construction of aGas Oil Separation Plant (GOSP)designed to process crude oil through gas-liquid separation, stabilization, and transportation systems.
The facility has a designed processing capacity of200,000 barrels per stream day (BPSD), significantly enhancing the crude oil processing capability and operational efficiency of the Zubair oil field.
During the construction of this project, our company supplied a range ofnickel alloy and stainless steel bars and pipes, which were used in critical process pipelines and equipment manufacturing, meeting the stringent requirements of the oil and gas industry for corrosion resistance, strength, and reliability.
Main supplied materials include:
Inconel 625 Round Bars
Size: Ø80 mm – Ø160 mm
Quantity: approx.28 tons
Inconel 625 Seamless Pipes
Size: 6" SCH 80
Quantity: approx.3,200 meters
UNS S31803 Duplex Stainless Steel Pipes
Size: 8" SCH 40
Quantity: approx.2,100 meters
All materials were manufactured and inspected in accordance withASTM / ASME standardsand supplied with fullMill Test Certificates (MTC)to ensure compliance with the strict quality requirements of the oil and gas industry.